[ad_1]
In a series of tweets, the minister said this road will be constructed on hybrid annuity mode with a total length of 31.425 kilometres.
The construction period will be two years and the project will also connect Agra, Mathura and western Uttar Pradesh, the road transport and highways minister added.
Gadkari also said that the construction of two flyovers with total length of 2.5 kilometres at Kushinagar, place of Lord Buddha’s Parinirvana in Uttar Pradesh, has been sanctioned with a budget of Rs 42.67 crore
These flyovers will be completed in 18 months, he said, adding that with their construction, the arrival of domestic and foreign tourists will be facilitated and the problem of traffic jam for local people will be solved.
[ad_2]
Source link